By Bruce Petty Modern concrete loading docks replace many of the railroads freight station’s aging wooden loading docks.For a little modeling fun, I used the same prototype method pouring real concrete, Dap Concrete Patch. The size of the concrete loading dock is 15 feet wide and 30 feet long. The […]
Daily Archives: October 11, 2019
2 posts
by Bruce Petty Union Pacific owned trackage rights all the way from Mission Tower to the top end of Taylor yard that served a 1.25 mile branch line that terminated at Forest Lawn Cemetery. The branch was a joint operation between UP and the SP, each railroad operating it every […]