The track crew is done with the yard


Finally, I have finished laying the track in the yard. All of the track from for the extension has been recycled from my scrapped Pacific Coast Railway and from T.H.E.R.R. that is in Showlow, AZ after it was rebuilt with Unitrack.

After the track was laid, I assembled a 9 car train of 40 foot boxcars and snaked it through the yard, and a 3 car train through the junction since the staging track isn’t laid yet.

Next up on the hit parade is wiring. Joy.

The two tracks in the yard can hold 17 40ft boxcars, not sure about the team track in front of the relocated freight station.