This afternoon I laid the rest of the track in the interchange yard. Eager to see how it works, I grabbed 6 MTL/Kadee Southern Pacific Lines and a Great Northern wood boxcars and assembled a simple train to push and pull through the switches by hand. It was rather rewarding to see that it was working the way that I wanted it to. Next up, laying the track to the soon to be relocated freight station, followed by wiring and painting the track…
Here are a couple of railfan pictures of the junction.
![](https://sopacincg.com/wp-content/uploads/2020/04/20200422_163953-1024x768.jpg)
![](https://sopacincg.com/wp-content/uploads/2020/04/20200422_164340-1024x596.jpg)