As I lay more track down, I am starting to see how this will operate. I am thinking about putting the freight station in the middle of the front two tracks (the front track is not laid yet, but the #6 switch is in place). As I lay more track, I realize that the tracks south of the second crossover on the arrival track and the drill track are too close together, and I will widen them.
![](https://sopacincg.com/wp-content/uploads/2020/04/20200418_122241-768x1024.jpg)
If you look at this picture, you can see how the arrival and drill tracks get too close.
The engine house is going to be where the Dremel is sitting now.
![](https://sopacincg.com/wp-content/uploads/2020/04/20200418_181456-1024x744.jpg)
I am also planning on scratch building an office to place at the back of the layout, this one might be a little too big.