operations

Shot a crappy, poorly edited cell phone video this morning. It’s fun playing engineer, conductor and cameraman all at the same time.
Operations…

I only have to wire up the freight station and engine house track, I have SPST switches for these, so I can store locos on them and still operate the layout. The soon to be laid staging track will be wired. I have also painted all of the track, up […]
Wiring is mostly done…

I realize that this is not prototypical paperwork for the Pacific Electric, but this is for a model railroad, and I am using artwork from an era correct notepad This is in Excel, so it can be edited as needed. I also plan to draw up a SPINS sheet for […]
Starting to prep for Ops

I was working on a plan to scratch build a Pacific Electric passenger shelter in N Scale for Playa Desnuda. About two weeks ago, I complained about the size of the lumber/plastic needed to build one, and the next thing I knew, it was available on Shapeways and while it […]